
This role involves operating heavy equipment and maintaining the wastewater collection system for the utility department. Key responsibilities include excavating, installing, and repairing sewer lines and manholes using machinery such as backhoes and trenchers, as well as performing system inspections, cleaning operations, and flow monitoring. The position offers a clear career progression path toward supervisory roles within the commission. The work arrangement includes field-based duties with potential on-call requirements, providing a stable opportunity to contribute to essential public infrastructure maintenance.










