
This full-time Pipe Layer role is based in the Austin, Texas area for MGC Contractors, a 100% employee-owned construction firm specializing in water and wastewater projects. The position involves installing and repairing underground water lines and sewer systems, including laying ductile and PVC pipe, setting precise grades using laser equipment, and performing pressure testing. Key duties also include cutting, threading, and welding pipes, as well as locating existing infrastructure through excavation. The role appeals to candidates seeking stability within an employee-owned company that values performance and offers opportunities for growth. The work is performed on-site at various construction locations, requiring physical stamina to operate in all weather conditions and handle heavy materials.







